1/15/10 Right on schedule the 2010 Unit Renovation got underway 1/4/10. First up Maintenance goes to work removing the old tile floors, all the built-in cabinets, wall tile (except the 2nd Bath area which will get replacement floor tile only) and plumbing fixtures.

Old floor tiles removed, old thin set also cleared and surface prepared for new tiles in main entrance walkway

Kitchen is a main area to be addressed for the first time since original construction.

Making sure that there are no leaks or hidden damage means clearing things to the bare walls.

The new cabinetry for the master bath and kitchen areas are distributed to the units and will be installed after the new floor tile.

The floor area in front of the counter will get new tile - replacing the former carpeted section for a cleaner look, easier maintenance and longer life.

In the master bedroom the tile flooring is removed and the old cabinetry gone. Once again maintenance will use this rare opportunity to ensure there are no hidden issues and then each building will be pressure tested prior to the reinstallation of the plumbing fixtures.

All the wall tile removed from around the jacuzzi tub to be replaced with granite.

The long awaited doors to the master bath area are in place.

Cement board behind the finish walls help ensure the units remain undamaged by water.

View from the bath side of the newly installed master bath doors

2nd bath area floor tiles removed and floor prepped for new finish

In the B side master the shower gets checked

And the door for the toilet area, another long awaited change, is in place.

The B side lock off also gets all new floor tile

The 2nd smallest bed room is getting a major makeover in this round.

Outside the granite has arrived.

Temporary "pods" house the new doors and other replacement items until needed.

 

This is the first few units of 32 (Buildings 3 & 4) to be done in this current round of work. Watch for updates as the new finish work starts to be installed in the next few days and we see what this first of two steps of unit renovation will look like in these initial 32 units.

 