2/12/10 The renovated units are getting closer to completion

The new look 2nd bedroom is 100% renovated from paint to carpet and everything in between. Queen size bed replaces the twin/trundle used since 2004.

One of the important items missed in the model unit was some type of table near the bed for glasses, tv remote, etc. It was addressed with a custom designed wall shelf shown here.

Sorry, a few photos got blurred. New flat screen 26" wall mounted HDTV next to the custom closet/dresser insert that gave us back so much floor space in this small room.

Combined with the previously installed double hung window for natural light and fire egress, as well as a new side chair, the small 2nd bedroom has had its space maximized. This and the master bath are the only areas 100% completed in this first round of renovation work.

Moving down the hall we see the brand new kitchen area. Here we have all new floor tile, including the wall under the counter area shown here, all new custom hardwood cabinets, sink, plumbing fixtures, granite countertop and backsplash. The first total renovation of these items since the resort was built.

Speaking of the hall the new floor tile is in place throughout the units. The new layout carries the tile to the master bedroom entry door for better wear (vs carpet) as well as better definition of the various room areas. The tile design in the entry hall mirrors the tray ceiling above it for a dramatic entry look.

Another slightly blurred photo (no. it's not your PC or eyes) showing the long awaited master bath area doors - a key part of this renovation work. No one knows who designed the original, door free layout, which has been the number one complaint from owners and guests, but it is being addressed now.

Inside the bath area are new cabinets, the floor tile, marble countertops, tub & shower surrounds, new plumbing fixtures and shower doors. Again a new look replacing the original 15 year old items installed at construction.

Wherever possible items have been reused - here we see the genuine Jacuzzi brand tub (still in great shape and extremely expensive to replace) as well as the large wall mirror in a new setting. We do have new custom framed mirrors over the sinks helping give the whole area a fresh look.

Same story in the B side, second master bath area. The new floor tile, new mirror, granite countertop and redesign of the refrigerator / microwave location in preparation for the second round of work. At that time the oversized dresser/entertainment center will be replaced with a dresser/desk to better utilize the space in this room and provide a work area.

B side marble shower surround and new shower enclosure.

The toilet door for the B side along with the new tile and a glimpse of the marble tub surround.

Larger view of the granite tub surround in the B side master bedroom.

Finally the round one redesign of the living room area. The move of the tv to the inside wall and change to placement of the sofas reflect's the new layout needed when the next round brings in a 52" wall mounted flat screen TV. At that time the large entertainment unit will be replaced with a lower, smaller dresser and desk.

Two more of the blurred photos. In preparation for the second round of work to include a wall mounted flat screen the cable connections have to be relocated. Once moved we need to rearrange the existing furnishings until the second round of work that will bring in the new paint color scheme, furnishings, carpet, tv's and soft goods.

The old chair from the small bedroom gets a new life in the living room until 2012. With the rearranging as well as the new floor tile and other changes the unit has a new look and feel as we get a couple more years of use from our existing furnishings. These 32 units are expected to be returned to service within the next two weeks. Then the work will start again on the next 32 in September 2010. As always it is the goal to keep the resort improving continuously, while holding expenses in line with available funding.

 