| 3/16/09
The landscaping renovation, the first total renovation since
original construction in 1992-1995, gets started near Building
1

Until now the original landscape work has been maintained
to keep the grounds looking as fresh as possible.

As plantings aged they have been pruned back, grown to exceed
the allowable size and in some cases removed.

Some areas under stress, such as the plants used to screen
the HVAC units, have been harder than others to support. In
this area all the original planting are now removed to prepare
for the new plants.

The new master plan is designed to improve on the original
work, blend in with our two recently upgraded areas around
the RALPH Building and Picnic / Recreation area and keep as
many mature trees as possible. During the preliminary inventory
only one existing tree was marked for removal.

Annuals removed from this area

Old mulch removed

Most of the old mid-height foliage will be removed and replaced
with new plantings


A new palette for welcoming design

Over at the Picnic / Recreation area some of the fencing
is being relocated to add more access to the grass areas.

The original layout closed off the grass from the courts
and walkways

By opening the space it will allow enjoyment of sports /
picnics on the formerly inaccessible areas.

The finished pillars at the entrance to the Picnic / Recreational
area that match those around the pool and other areas of the
resort

Work on the landscape renovation will be ongoing throughout
2009.
See
previous Photos
|