| 4/25/10
Recent work in pictures
The first
round of unit renovations were completed in March with 32
units done. Included were one of the handicap units

The unit
has a roll in shower, grab bars and other accessible features

Hand held
shower

Fold down
shower seat

Grab bars
around toilet
At the
same time a new patio area dedicated to Cafe customers has
been created near the volcano pool

A different
color paver was used to distinguish the Cafe area



New tables,
a small out bar and logo umbrellas will be installed next

All of
the foliage around the pool gets refreshed



Some was
planned for the general landscape upgrade and some were replaced
due to the harsh, below normal temperatures earlier this year

Another
scheduled project was renovation of the pool bathrooms.

As can
often occur when the work started the actual condition was
much worse than anticipated

It turns
out that water and dry rot damage was severe.

Much of
the building was actually being supported by the exterior
stucco!


It was
fortunate the damage was discovered through planned maintenance
as a serious storm could have caused a possible collapse of
the building.

Making
the building meet access standards and to improve the layout
required relocation of some plumbing and electrical.

Photos
above from late March

Three
weeks later reconstruction is well underway

The damaged
walls have been replaced with new framing



Little
more than the (expensive) original roof remains - preserving
our investment in those recently replaced tiles (2007)

Drainage
work outside building

New separate
entrances on front of building get framed in. More updates
soon