8/27/08
Lets get down into the dirt and see the results of the storm
too.

The
new sewer line for the Cafe


This
is before the storm hit - note how dry everything is.


Patching
the trench (yes, the rain has started)





After
the rain - look at the water level!

Out
at the picnic / recreation area work resumes on the Gazebo



The
transition area between the picnic /recreation area and
building 8


OK,
how much did it rain? The dark mark on the pond bridge was
the high water mark. Never been higher.

Meanwhile
we have actually started another project.

Repairing,
rebuilding and repaving the parking lot and driveways

After
16 years of hard use it's due

Back
to our favorite sewer installation


The
HVAC for the Cafe gets installed


We
have doors on the Cafe


Back
to more pavement restoration



Another
day at the sewer hook up. The dewatering crew showed up
and emptied the hole so the connection could be completed.


Dewatering
pump

Back
in the hole




Refilling
the hole



The
Gazebo footing holes await County approval

We
should have some Gazebo construction shots and more finish
work on the Cafe soon.
See
previous Photos