3/3/07
This weeks progress

Concrete
sidewalks have been poured and cured

Fencing
starts to go back up

Public
sidewalk on Lake St side is in place

Cement
base for driveways arrives

View down
the public sidewalk looking at the driveway exit

Entrance
to new driveway with concrete base material

West side
of building by pool. New sprinkler piping laid out

Paving
due soon. Final step will be the landscaping work.

The roofing
project heads into its final stages as the last three buildings
are well under way.

This is
building 7, the largest building on property being stripped
of tile


The new
underlayment is rolled out

At building
5 the metal surface is moving along well


Some areas
of Building five already have the finish parts in place

Building
6 is also in the process of tile removal

A view
of the finished product on Building 2. It is complete.

Building
1 (as well as 3,4 and 8) are also completed and accepted

Building
3 as finished



Another
view of Building 2

Building
4 pool side


Building
5 from the Clubhouse view still underway

Building
6 from the Clubhouse side with new underlayment in place

Moving
to the Lobby work. The new lighting is installed

Behind
the front desk area

Near the
fish tank



One of
the lobby seating areas

We hope
to have some wider angle photos of the finished lobby soon.