3/13/07
The new driveway paving gets installed - UPDATES 3/14 &
3/15/07

Cleaning
the area


Paving
equipment arrives



Fencing
is in place - new gates have not arrived


Sealer
in place for finish coat


Pavement
installed on the new cart path - resort side

Pavement
near loading dock

Apron
near Lake Street


Driveway
meets the cart path - Lake Street side

Driveway
entrance - East side of building toward pool

Location
of the new driveway gate


Close
up of cart path and sidewalk on resort side

The base
for Charlies new home in the lobby

The new
chandelier is being assembled for the lobby

UPDATE
3/14/07

The drainage
system is installed behind building 7

Back at
the new building the landscape work begins with new palm trees

New trees
on the pool side

Pool side
of the building

Trees
by cart path and Building 5

Bushes
on the back side/Lake Street

The access
gates are installed and await the power operators

UPDATE
3/15/07

Bushes
and mulch next to cart path

New landscape
takes shape next to Building 5


Cart path
by the RALPH Building

Fence
line, building side on Lake St

Outside
Building along new Access Drive.
3/17/07
And the final updates for this week:

The path
to the pool by the resort (front) side of the RALPH Building

The pool
side of the new sidewalk

New landscaping
where the 1/2 basketball court used to be

So far
the trees, shrubs and other plants along with the mulch are
in place. Grass to be installed next week.


Small
plants around the new transformer pad near sidewalk to building

Remember
the exposed water main pipes? There still in there but much
less visible now.

Completion
of the perimeter fence relocation.

More bushes
and trees near the sand volleyball and swing set area behind
the pool

Low maintenance
ground cover on the back side toward Lake Street.

Looking
toward the delivery dock

The RALPH
Building side of the cart path awaits the grass sod

The Building
5 side of the cart path also gets sod next week.
It is
expected that the building, fencing and grounds will be totally
complete by the Annual Meeting next weekend. The residential
building exteriors will be painted next and the construction
of the new recreation area in front of the Clubhouse is scheduled
to begin in mid to late May.
Much more
to come. Check back frequently.