• 10/15/12 – Weekly photo update as work continues all around the resort.
  • For those who haven’t seen it here are a few shots of the new Grande Villas Resort check in / Clubhouse building directly across from our rear entrance.
  • Drive way for guest drop off.
  • Parking spots reserved for check in only.
  • Side view from parking area.
  • The new Grande Villas check in desks.
  • View from rear to front doors of the new Grande Villas check in area.
  • From the back there is a hallway to the new exercise / fitness room at the Grande Villas Clubhouse.
  • Exercise equipment at the Grande Villas Clubhouse. All amenities at both Cypress Pointe resort and Grande Villas Resort are available to all guests at both resorts.
  • View looking from rear to front of building of the Grande Villas Clubhouse Fitness area.
  • View of the Cypress Pointe Resort Clubhouse Fitness Room.
  • The equipment has also been recently upgraded or replaced at the CPR Fitness room. Guests and owners now have two areas to workout when on site.
  • A few more full views of the completed Interactive Water Feature at Cypress Pointe Resort.
  • View from the shallow end of the signature Volcano Pool at Cypress Pointe.
  • View from the hot tub area back toward the new fountain.
  • Building 8 joins the clean roof brigade. This work is required approximately every 18-24 months. As we have metal and tile roofing materials it cannot be walked on and must be cleaned from a lift.
  • The new entrance has been inspected for fire compliance& the under layment is 90%+ installed.
  • After a screw inspection by the County (expected today 10/15/12) the stucco will be installed. Work is expected to be complete and the new entrance opened by the end of October.
  • Update 10/19/12
  • The ceiling finish is installed
  • The pillars take on their final shape
  • Concrete base and framed upper structure become one pillar
  • Design duplicates that of the original “short porch” on the building.
  • More of the nearly finished ceiling & the lighting.
  • Job finish is expected by the end of next week except for landscaping.
  • 10/20/12 Update
  • The creation of the pillars is continuing
  • Close up of original pillar & the new, larger version under construction
  • Plenty of detailed work to be done making it all look right.
  • Looking out from the doors toward the entrance driveway
  • Approximately 4 coats / steps are required to create the finished surfaces.
  • looking up at the intersection of the ceiling and the upper pillar color.
  • Roof line, gutter drain hidden in pillar
  • The new face of the Clubhouse takes final shape.
  • Update 10/24/12
  • The pavers arrive for the driveway
  • Curbing is installed, surface awaits the paver installation then the blacktop up to that.
  • Reconfigured sidewalk is prepared for installation.
  • The stucco is done – the structure has a nearly completed look.
  • New sidewalks poured
  • Update 10/25/12
  • Lights ready to go on ceiling. Note the sprinklers and ceiling fan mountings
  • Putting in the driveway pavers
  • Base ready for pavers
  • The new entry pavers – slightly lighter color than the driveway pavers
  • The “rumble strip” section to identify the walk from the driveway area as required. This is what the whole project is about bringing us into full ADA compliance for access to Clubhouse / Pool
  • After the pavers comes the asphalt drive. Section up to the covered area is installed.
  • Much more to come. Check back to see progress pictures.