• 09/29/12 – Work continues over the weekend on the ADA entrance and a look at the finished landscaping and fencing around the Interactive Play Fountain
  • Go to 10/5/12 Update
  • Update 10/8/12
  • The revamped landscape outside the pool/fountain area
  • One of two new entrances to the Interactive Play Fountain looking toward hot tub area.
  • Landscaping was redone all around the fountain
  • New fencing next to main Volcano Pool area
  • Area next to fountain looking out of pool area toward Building 4. Original concrete sitting area was preserved and reused.
  • Fencing around support equipment and use rules sign.
  • New fencing from Volcano Pool side looking into fountain area. Second entry gate at far upper right.
  • Moving back to the entrance: The flag poles ready to be moved
  • Flag poles taken down (plans call for reuse in a newly redone flag island).
  • The concrete is poured at the base of the four new pillars
  • These aren’t going anywhere once completed.
  • This is important for protection from errant autos and potential storms.
  • Higher up on the structure the pillars and wall cladding are being installed.
  • You can start to see the final shape emerge.
  • Update 10/5/12:
  • Insulation installed on underside of roof (required by code)
  • Flag poles successfully relocated to new permanent home. Poles were reused to save on expense.
  • The underlayment for the stucco is attached (will form the finished pillars).
  • The roof drain lines and electric are hidden inside the pillars.
  • View of the original short porch & the style of the pillars to be duplicated.
  • Creating the drain pipe discharge lines.
  • Care is being taken to match the original Clubhouse structure such as the roof edging. This will blend the structure into the overall building as if it was there originally.
  • Another view of the relocated flag poles on the redesigned flag island.
  • Update 10/8/12
  • Underlayment is nearly installed.
  • Stucco due to be installed starting tomorrow (10/9/12)
  • Next week the new pavement, sidewalks and landscaping are scheduled for installation.
  • The flags are proudly restored in front of the Clubhouse.
  • Much more to come. Check back to see progress pictures.